In the timespan of 1 180 days from August 29, 2021, there were 1 availability checks completed for substation-curacao.com. Having been checked 1 times in total, substation-curacao.com was last confirmed operational on August 29, 2021, as evidenced by a 200 status code. Based on checks completed as of November 22, 2024, there was no observed downtime for substation-curacao.com. Based on the responses received, there are no instances of error status codes recorded as of November 22, 2024. Compared to an average of 4.830 seconds, substation-curacao.com's August 29, 2021, response time was 4.830 seconds.